Project Completed By Al-Reyaza Company For
The Iraqi government

1-Different projects(contracts) with Mosul munici- pality in, Irish crossing & paving Roads with concrete in different sectors in Ninevah province (2004&2005). travt tion, 11-Co ries labs

2-The outer Fence of Ibn AlAther hospital in Mosul city, (2005). ,also gen

3-Rehabilitate a Warehouse project in Baghdad,( 2005) side 201

4- Rehabilitate Al Bu Saif Water Drinking Station -Ninavah water directorate (2006-2007).

5-Rehabilitate a Workshops in Mosul Institute, Min- istry of higher education, (2007).

6-Different projects in construction earthworks, sub bases, paving concrete in different sectors the contract side:, Mosul Munici- pality, (2006&2007).

7-Executing a building project (History college) 3 stories with area 1100m2 each floors) in Mosul University, the contract side Ministry of High Educa- tion, (2007).

8- Executing building and sport hall project in area 1300m2 (2 floors) with all its utilities& furniture’s in Mosul Technical college, the contract side:Ministry of Higher Education Nina- vah, (2008)

9-Constructing Al Hadba Sewage pump station with its treatment tanks, Submersibl pumps, different sizes of pipe line (250-900mm ) within 1km length(Ductile, P.V.C) as a joint venture with Al Arabi co. for general con- tracts, the contract side: Sewage Ninavah Directorate (2009).

10-Rehabltating Mosul University staduim, Ministry of High Education, (2009) as a joint venture with Sama nenawa co.for general con- travts Itd, the contract side: Ministry of High Educa- ci- tion, (2009). ah

11-Construction for workshop and labs building 2 sto- ries with 5000 m2 and supplying all technical testing labs(material, environmental, survey) equipments ,also furnitures as a joint venture with Al Arabi co. for general contracts in Mosul Technical college, contract side: Ministry of Higher Education, Ninavah, (2009- 2010).

12-Excuting Presidency building and area of the building in Mosul University (10000m2- fivestories), 1900m2(five stories) With all utilities (decoration, ventilation VRF system 600ton …) as a joint venture with Al Arabi co. for general co- ntracts contract side:Ministry of Higher Education Ninavah, (2010-2012).

13- Rehabilitation for sports hall and swimming pool,new penthouses area 2500m2 at the Ath- letic collage in Mosul University, Ministry of Higher Education, (2011-2012).

14- Executing a building project 3 stories with area 1100m2 each 3 floors) as a joint venture with Al Arabi co. for general contracts in Mosul Univer- sity the contract side Ministry of High Education, (2011-2012).

15- Executing an Emergency department building in Al Salam Hospital project as 2 stories with area 3000m2 each floors with all utilities from chillers, air washers elevators, pumps and all electric equipments as transformers, generators and building manage- ment systems with medical gases and medical devices ….as a joint venture with Al Arabi co. for general con- tracts, the contract side: Ministry of Health -Ninavh Governorate (2012-till 2014).

16-Execution of the project preparation of studies, de- signs and test the soil and the feasibility study for 50 bed hospital in the following locations (Al Hatra dis- trict, Al Shemal district, Al Qahtaniya district )in 2013- 2014with AYTEK asTurkish company the contract side :Ministry of Health, Ninavh Governorate

17- Execution of the project preparation of studies, de- signs and test the soil and the feasibility study for 100 bed hospital in the following locations (Basheqa dis- trict)in 2013-2014with AYTEK asTurkish company, the contract side Ministry of Health Ninavh Governorate 

18- Construction for Emergency building in Al Salam Ninawa Gov.& Ninawa Health Hospital/stage one

19-Supply and install PSA medical oxygen generator 64m3/hr to Hamdaniya Hospital in Ninawa Gov.

20-Supply and install PSA medical oxygen generator 64m3/hr to Tel Afer Hospital in Ninawa Gov.

21-Developing middle islands in the center of Mosul district

22- P/AM608/18 Renovations of 3 schools in Batnaya outside Mosul Ninawa Governorate

23- P/AM84/18 Rehabilitation of Al Mamoon Secondary School For Girls West Mosul- Ninawa

24- P/AM699/18 Supply Equipment (for Computers, Electricity and Metallurgy Laboratories) of Industry High school in Telsquf-Telkiaf sub district-Ninawa Governorate/JV Al Bayan

25- P/AM01/19 Cash for work through Painting, Desks Repairing and Planting in East Mosul In 66 schools in east MosulJoint Venture with Al Bayan Company

26-Completion of the building of the Presidency of University of Mosul

27-Rehabilitation of swimming pool and Hall Sports Hall Sports

28-Completion of the Project building of University of Mosul

29-Completion of the building of the Presidency Site works of the University of Mosul

30-Construction/Supply /High Tension Station of laboratories & workshops

 

Project Completed By Al-Reyaza Company for
UNESCO

1-contract no 4500483162- A2 Restoration and Rehabilitation of the House of Prayer, the Conventual Church of Our Lady of the Hour (Al-Saa’a Church), Mosul, Iraq

2-contract no. 4500472684-Al Sa’aa church – Phase II Rehabilitation of the interiors of the Complex and of the entire services system: electrical, air conditioning, water and sewage

3-contract no 4500490133 A2-Completion of the Reconstruction of Al Ekhlaas School in Mosul, Iraq

4-contract no 4500459047-A1 Stabilization & Rehabilitation Works of the Al Saa’a Church Complex in Mosul, Iraq/Stabilization Measures External work

5-contract no 4500466206-A1 Restoration and Rehabilitation Zyada House

Project Completed By Al-Reyaza Company for
UNDP

1-CON-128-22 – “Safety Measures for COVID-19 Isolation Unit-East Mosul Ninawa Governorate.

2-CON-338/21 Rehabilitation of Agricultural Technical Institute in Nimrud (Hamdaniya) Ninawa Governorate, Iraq

3-CON-474-21 Rehabilitation of Five Sport Fields at Mosul University-East Mosul Ninawa Governorate, Iraq.

4-CON-185-22, Renovation of 293 Housing Units in Al-Abar Neighborhood Al-Rabeea Area, West Mosul

5-CON-063/22 Phase-II Rehabilitation of 361 Housing Units in Al Khazrag Neighborhood-Old City-West Mosul, Ninawa, Iraq.

6-CON-59/22 – Phase-II Rehabilitation of 300 Housing Units in Al-Ghizlani and Wadi Hajar Neighborhoods-West Mosul

7-CON-420/21 – Phase-II Rehabilitation of 218 Housing Units in Manqusha, Mashahda and Ahmadiya-Old City Area-West Mosul

8- CON-354/21- Supply Benches to Livestock Department -Forest & Agriculture College -Mosul University-East Mosul-Ninawa Governorate

9-Con.095-21 Re Advertisement-Phase-II Rehabilitation of 222 Housing Units in Al Khatoniya Neighborhood-Old City-West Mosul/JV Al Bayan co

10- P/AM246/20 Supplying of laboratory Equipment for Hawija Agricultural Laboratory –Hawija Kirkuk(JV Al Bayan Co)

11-P/AM206/20 Rehabilitation of Access Road for Women Education College

12- CON-064-21 Cash for Work for Rubble Removal from Houses and Streets, Curbstone and Walls Painting in Al Nimrod Center and Surrounding- Ninawa Governorate/JV Al Bayan co

13-CON 158-21 Cash for Work for Rubble Removal in Industrial Zone-Hawija-Kirkuk Governorate ,Iraq. /JV Al Bayan co

14- P-AM256-19 Cash for work for rubble and debrise removal from 120 houses and streetsin nabi jarjees and 50 shops in main streets in old city west mosul Iraq JV Al Bayan Co)

15- P/AM244/19 Rehabilitation of Women Education Building-Mosul University-East Mosul Ninawa Governorate Phase-II

16- P/AM230/19 Cash for Work for Repairing Desk, Painting Curbstones and Rubble Removal in Mosul University and Ninawa University Phase-II, Iraq

17- P/AM167/19 Cash for Work for Repairing Desk, Painting and Rubble Removal in Northern Technical University – Phase-II -Joint Venture with Al Reyaza group Company

18- P/AM69/20 Rehabilitation of 50 Houses Batnaya sub district Telkeaf district/Ninawa Governorate/JV International Borders co

19- P/AM86/19 Rehabilitation of 50 Houses Batnaya sub district Telkeaf district/Ninawa Governorate/JV International Borders co

20- P/AM585/18 Rehabilitation of Al Muthana Sports &Youth Center-East Mosul- Ninawa Governorate

logo

مكتب كردستان
فرع اقليم كوردستان
Branch Manager Mr. Tahsen Hassen
Tahsen@reazagroup.com
mobile : 00964-7507622505
Address:
Iraq-Kurdistan -Dohouk city- Gouch building , fifth floor ,
flat no.8 ( branch office ) .

مكتب كردستان
فرع اقليم كوردستان
Branch Manager Mr. Tahsen Hassen
Tahsen@reazagroup.com
mobile : 00964-7507622505
Address:
Iraq-Kurdistan -Dohouk city- Gouch building , fifth floor ,
flat no.8 ( branch office ) .